connector now has a track on it

Top 2 km section of the Connector trail was track set this morning)sat Dec 22), early season conditions so watch out for the odd stump and brush sticking out.

Dave was heading out in the pm to put fresh tracks on the Field VRC/Nat Bridge to Kick Horse river section, so with the exception of the lake all our trails are  track set.

Go check it out!

Please follow and like us:
Sign up for Email updates
Subscribe to RSS feed